Post Offer Free
China Engineering Equipment Network Co.,Ltd  

Gold Index: 3567

You are here: home  > Hydraulic Marine Deck Mobile Crane for Assembling Construction

Hydraulic Marine Deck Mobile Crane for Assembling Construction 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail


Hydraulic Marine Deck Crane  for Assembling Construction , Deck Mobile Crane
 
Deck C

Hydraulic Marine Deck Crane  for Assembling Construction , Deck Mobile Crane

 

Deck Crane

 

Derrick crane is mainly used for assembling construction of roads, cross river cross sea steel box beam of cable-stayed bridge, the equipment is installed on the bridge deck, and accurately and safely lift the steel box girder section from sea beam transport ship (or steel trestle bridge) to the bridge deck for assembling and welding, and it can also be used to hoist for other beam block or steel girder.

 

It is mainly divided into fixed Derrick crane, luffing Derrick crane and tower type Derrick crane and its derivatives products "shore crane".

 

 

Fixed Derrick Crane:

     1, It is mainly used for erection the pier beam of steel box girder cable-stayed bridge and the standard girder:

     2, Feeding under the bridge;

     3, Use front support and back anchor for supporting;

     4, Precisely adjust the position of the beam through the luffing mechanism and hanger adjusting

 mechanism;

     5, Symmetrically erect from both sides to shorten the period

 

Luffing Derrick Crane:

1. It is mainly used for erection the pier beam of steel box girder cable-stayed bridge and the standard girder:

2. Feeding under the bridge;

3. Use front support and back anchor for supporting;

4. Precisely adjust the position of the beam through the luffing mechanism and hanger adjusting

 mechanism;

5. Symmetrically erect from both sides to shorten the period.

 

 

Tower Type Derrick Crane

1. It is mainly used for erection the standard section of steel box girder cable-stayed bridge;

2. Rear feeding; Moving the girder by girder carrier to inside the derrick crane, and use the

 winch trolley lifting the beam, rotation and then erection;

3. Use front support and back anchor for supporting.

bigPhoto
 Mr. Mr. Henry Z

Tel: 86-27-87779836
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

China Engineering Equipment Network Co.,Ltd [China (Mainland)]


Business Type:Manufacturer
City: Wuhan
Province/State: Hubei
Country/Region: China (Mainland)

You May Like:

Product (72)