China Engineering Equipment Network Co.,Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Pre-stressed tensioning system and post tension jack forLonghu inner ring road Bridge
Kattor Intelligent pre-stressed tensioning system applied in Longhu inner ring road crossing North water conduit Bridge
In order to speed up the construction progress, The project uses Precast pre-stressed concrete girder for approach bridge, Kattor provided solution for the girders building. To ensure the thinner concrete sections and longer spans between supports but with stable physical properties. The process including following:
Kattor Product:
Type |
Tension capacity Ton (kN) |
stroke (mm) |
Max Tension capacity (Kn) |
Oil capacity (cm3) |
Hole Dia. (mm) |
Cyl dia. (mm) |
Plg. Dia. (mm) |
Mount hole Dia (mm) |
Coll. height (mm) |
Ext. height (mm) |
weight (kg) |
||
Tension |
retraction |
Tension |
retraction |
||||||||||
HPC1508 |
150(1526) |
200 |
1526 |
674 |
4360 |
1926 |
100 |
260 |
177.7 |
152 |
480 |
680 |
142 |